Project Overview


Design and installation of 130′ diameter sheet-pile shoring for a 46 foot deep excavation. 92 pair of 75′ long sheet piles – each pair weighing over 10,500 lbs – interlocking together and driven vertically to grade to allow construction of a sewer lift station, and then removed after backfill of the structure. Two 100 ton DDF crawler cranes were used for the installation of the sheet piles.
Market
Commercial/Multifamily
Owner
COP Construction
Type of Project
Earth Retention
Completion Date
December 2018

Contact Us

We would love to talk with you.

If you’re ready to start a new project, learn more about what we do, or would like to make a general inquiry about Blount Contracting, please be sure to contact us. We’d love to hear how we can help you.

Ethical Workplace Reporting
Speak Up Hotline
Black Phone Icon (480) 985-2112
Black Email Icon info@blountco.com
Visit us 1353 S Vista Rd
Apache Junction, AZ 85119
Black Phone Icon (801) 802-6800
Visit us 869 North 1500 West
Orem, Utah 84057
  • Type the word Blount below.