Industrial/Energy
Project Overview
Work consisted of the construction of a new dike system and 8 new ponds with leak detection systems. The new dike system tied into the existing dam and was made of a 70/30 crushed native material/fly ash blend. The blending process required extensive quality control measures that lead to the solid construction of several new dikes averaging 25’ in height. In order to protect slopes, BCI batched soil-cement that was installed 12” thick and then subcontracted the installation of HDPE Liners
Market
Industrial/EnergyOwner
Salt River ProjectType of Project
Site WorkScoped Performance
Blount installed a new dike system and 8 new ponds for the Salt River Project.Completion Date
December 2016Video Headline
Watch Video 
Contact Us
We would love to talk with you.
If you’re ready to start a new project, learn more about what we do, or would like to make a general inquiry about Blount Contracting, please be sure to contact us. We’d love to hear how we can help you.
Ethical Workplace Reporting Speak Up Hotline
Apache Junction, AZ 85119