Komatsu 300 Loading Dirt Onto Truck

Industrial/Energy

Project Overview


Work consisted of the construction of a new dike system and 8 new ponds with leak detection systems. The new dike system tied into the existing dam and was made of a 70/30 crushed native material/fly ash blend. The blending process required extensive quality control measures that lead to the solid construction of several new dikes averaging 25’ in height. In order to protect slopes, BCI batched soil-cement that was installed 12” thick and then subcontracted the installation of HDPE Liners
Market
Industrial/Energy
Owner
Salt River Project
Type of Project
Site Work
Scoped Performance
Blount installed a new dike system and 8 new ponds for the Salt River Project.
Completion Date
December 2016
Aerial View of Navajo Generating Station
Blount Crew Member Working at Navajo Generating Station
Equipment in Action at Navajo Generating Station Project
CAT Equipment in Action at Navajo Generating Station Project

Video Headline

Video Thumbnail
Watch Video Play Icon

Contact Us

We would love to talk with you.

If you’re ready to start a new project, learn more about what we do, or would like to make a general inquiry about Blount Contracting, please be sure to contact us. We’d love to hear how we can help you.

Ethical Workplace Reporting
Speak Up Hotline
Black Phone Icon (480) 985-2112
Black Email Icon info@blountco.com
Visit us 1353 S Vista Rd
Apache Junction, AZ 85119
Black Phone Icon (801) 802-6800
Visit us 869 North 1500 West
Orem, Utah 84057
  • Type the word Blount below.