Industrial/Energy

Project Overview


This project was originally designed without any pile support. DDF contracted with Spindler Construction of Logan Utah to provide temporary shoring for a deep excavation. Along with our shoring designer, we recognized a potential savings to the project if driven piles were used for both support and uplift resistance, which significantly reduced the depth of excavation, and lightened-up the structure since the uplift forces would be handled by the driven piles.

The use of the driven H-pile concept was accepted by the owner (City of Logan, Utah), and DDF installed a total (83) H-piles on varying lengths of up to 55 feet, along with the sheet pile shoring for the relatively deep excavation in very poor, wet soil conditions.

DDF was awarded a (2013) “Project of the Year Award” by the Pile Driving Contractors Association for this project.
Market
Industrial/Energy
Owner
Sunrise Engineering
Type of Project
Deep Foundations, Earth Retention
Scoped Performance
Shoring Design: GEOSYSDesign Sheet Pile Shoring – Design & Installation 30’ deep fully enclosed excavation protection
Completion Date
January 2014

Contact Us

We would love to talk with you.

If you’re ready to start a new project, learn more about what we do, or would like to make a general inquiry about Blount Contracting, please be sure to contact us. We’d love to hear how we can help you.

Ethical Workplace Reporting
Speak Up Hotline
Black Phone Icon (480) 985-2112
Black Email Icon info@blountco.com
Visit us 1353 S Vista Rd
Apache Junction, AZ 85119
Black Phone Icon (801) 802-6800
Visit us 869 North 1500 West
Orem, Utah 84057
  • Type the word Blount below.