Industrial/Energy
Project Overview
US Magnesium pumps water from the Great Salt Lake into huge evaporating ponds west of the lake, and from there extracts minerals. With lake levels receding to historic (low) levels, they needed a deeper pump station in order to continue to pump the volume of water necessary to continue operating efficiently.
The project included the installation and anchoring of sheet piles to provide a deep area for intake of unrestricted water to pumps, and 16” Pipe Piles for support of the heavy pumping equipment and structures, etc.
Market
Industrial/EnergyOwner
IGESType of Project
Deep Foundations, Earth RetentionScoped Performance
Sheet Pile Shoring w/anchors, 16” Pipe PilesContact Us
We would love to talk with you.
If you’re ready to start a new project, learn more about what we do, or would like to make a general inquiry about Blount Contracting, please be sure to contact us. We’d love to hear how we can help you.
Ethical Workplace Reporting Speak Up Hotline
Apache Junction, AZ 85119