This 450MW wind farm was constructed outside of San Angelo, TX. First on the job and the last to leave, Blount’s scope included everything from clearing and grubbing to final site grading and reclamation.

One of the challenges was building 80 miles of aggregate base roadways at an accelerated pace to allow for the large component deliveries. This was achieved by working multiple crews across the site which was spread over approximately 55 square miles. The work also included foundation excavation, crushing and screening of rock, and backfill for each turbine location.
Market
Industrial/Energy
Owner
Apex Clean Energy / Fagen
Type of Project
Mass Excavation, Site Work
Scoped Performance
From land clearing and grubbing to final site grading and reclamation, Blount finished this large project with multiple crews spread over 55 square miles.
Completion Date
September 2020
Wind Turbines at the Wind Farm Project Site
Wind Turbine at Aviator Wind Farm Project Site
Bulldozer in Action at the Aviator Wind Farm Project
Aviator Wind Farm Project Site
Blount's Bulldozers Working at Project Site
Wind Turbine
Dump Trucks Driving Through Aviator Wind Farm
Bulldozer Moving Material at Project Site

Contact Us

We would love to talk with you.

If you’re ready to start a new project, learn more about what we do, or would like to make a general inquiry about Blount Contracting, please be sure to contact us. We’d love to hear how we can help you.

Ethical Workplace Reporting
Speak Up Hotline
Black Phone Icon (480) 985-2112
Black Email Icon info@blountco.com
Visit us 1353 S Vista Rd
Apache Junction, AZ 85119
Black Phone Icon (801) 802-6800
Visit us 869 North 1500 West
Orem, Utah 84057
  • Type the word Blount below.